← Eralta Global home

Founder guide

How much does it really cost to start a clothing line?

“How much money do I actually need?” is the question first time founders ask most, usually followed by “Can I do it for less than that?” The honest answer is that the number depends less on your factory’s unit price than on everything wrapped around it, and that most first budgets are missing a third of the cost. Here is the stack, in the order it will find you.

The unit price is the beginning, not the cost

The number a factory quotes is the sewing and materials cost of one garment, at their door. Your cost is what one sellable garment costs, in your hands, ready to ship to a customer. That is called landed cost, and the gap between the two numbers is where first launches lose their margin.

Take a simple example. A hoodie quoted at 14 dollars to manufacture. Add labels and packaging. Add freight, which depends on weight, volume, and how much travels by air because a date slipped. Add duty, which depends on the garment’s classification and country of origin, and can move it by double digit percentages. Add a customs broker, inspection, and getting cartons from port to storage. That 14 dollar hoodie lands in the low twenties before you have spent anything on selling it. Pricing guides put the typical founder underestimate at 20 to 40 percent of true cost. Nothing on the list is exotic. It is just never in the first quote.

Your landed cost also carries a share of everything spent before production: patterns, tech packs, and sample rounds, divided across the units they produced. Small runs carry that share heavily, which is one reason first runs feel expensive per piece wherever you make them.

Minimums are the real budget

Founders think in unit price. Factories think in minimums, and minimums are what turn a design into a cash commitment.

The arithmetic multiplies fast. New founders want 50 to 100 units. Most factories want 300 to 500 per style, per colour. Three styles in three colours is not a small order, it is nine minimums. Then the rest stack underneath: fabric from a mill at hundreds of metres or more, labels at a thousand pieces, packaging at two thousand. Adding a colour costs as much commitment as adding a style.

This is why the honest answer starts with how few styles you can launch with. A first collection of twelve pieces is a classic way to run out of money before learning anything. One to three styles, proven and then expanded, is how the brands that survive usually did it. And a low minimum factory charging 20 to 40 percent more per unit is often the rational choice: for a young brand, cash tied up in unsold inventory is a bigger risk than a higher unit cost. A lower price per piece only helps if you can sell everything you were required to make.

The costs that arrive before production

Before a single bulk unit exists, expect to pay for: pattern making, commonly a few hundred dollars per style; tech pack help if you hire it, in a similar range per style; and sampling. Budget two to three sample rounds per style, at two to three times the eventual unit price each, because the first sample will not be right and the corrections are the work. Changing your mind mid sampling restarts more than the sample: fabric, trims, and costing all move. If your product is for children, or makes performance claims, add testing and compliance. Most founders budget zero for it, and the bill arrives anyway, because the legal responsibility sits with the brand, not the factory.

Price backwards, and give the timeline a cost

Set the retail price first, from what your customer will pay, then engineer the cost to fit it, not the other way round. The structure most of the industry works to: retail ends up around four to six times landed cost once wholesale and retail margins are stacked. If your target retail price cannot carry your landed cost at something like that ratio, the product needs re engineering, a different factory, or a different price, and it is far better to learn that from a cost sheet than from a warehouse.

Time is a cost too. “Thirty days to sew” becomes 90 to 120 days from idea to delivered product once sampling, materials, freight, and customs are in the calendar. Every week of that is cash out before revenue in.

How we help

Costing is where our two backgrounds meet. At global scale we ran range, pricing, and margin on a business of more than a billion dollars. In our founder build, we costed a brand from zero and defended every line and every inventory buy in margin and cash terms, in front of the people whose money it was. The deliverable we build for founders is a cost sheet that tells the truth early: full landed cost, minimums mapped against a realistic first range, and a good, better, best pricing ladder with the margin consequence of each call.

If your numbers are still a quote and a hope, that is exactly the point to talk. Email [email protected], or use the contact form and tell us the product and the price you want to sell it at. We will tell you whether the math can work.

Still working from a quote and a hope?

That is exactly the point to talk. Tell us the product and the price you want to sell it at, and we will tell you whether the math can work.

Book an intro call [email protected]